
AV Institute · Week 6Advanced AV Control & Integration
Field Assignment
Submit an Annotated Control Architecture, Sequence of Operations & Test Plan
Est. 60 minCompetency: Document the control design and how it will be tested.
Learning objectives
- Produce an annotated control architecture diagram.
- Write a complete sequence of operations.
- Write a test plan covering each state.
Assignment brief & submission
Submit the control architecture, the sequence of operations, and a test plan for the integrated conference room.
Deliverables
- 1Annotated control architecture (processor, devices, links, protocols).
- 2Sequence of operations for every state.
- 3A test plan: per state, the actions, expected feedback, and pass/fail criteria.
Why a test plan
A test plan turns the spec into verifiable checks. It is how commissioning confirms the room does what the spec says — and how service later proves a repair.
Implementation checklist
- ✓Control architecture annotated with protocols.
- ✓Sequence of operations complete for all states.
- ✓Test plan covers each state with pass/fail criteria.
Downloadable study guide
study-guide.txtcopy-paste ready
01. Deliverables: architecture + sequence of operations + test plan. 02. Test plan: per state, actions, expected feedback, pass/fail. 03. Architecture shows processor, devices, links, protocols.